Giga-International operates a data center in Munich, which is our traditional place of business. The ultra-modern "green data center" was constructed in 2009. It provides enough colocation room for more than 4000 servers. The services offered here range from standard dedicated servers to colocation. Our office roomes are in the same building, only one story above the data floor.


Facts about the Giga-International data center Munich:

Location:

  • Munich - Germany
Data center area:
  • Ca. 300 m², expandable
Office and Support area:
  • Ca. 300 m², expandable
Air Conditioning:
  • Redundant
  • Free Cooling
  • Energy-efficient
  • Remote-controlled
  • Expandable
Internet Access:
  • Carrier-neutral
  • 3 different fiber carriers in the building
  • Almost any carrier available by the use of inner-city connections
  • Connection speed starting at 10 Gbit/s
Energy supply:
  • Inhouse transformer-station
  • 1 Mega-VA total connected power to the datacenter - expandable
Security:
  • Access only via ID card
  • Alarm system
  • Security service on duty
  • Observation cameras and video recording
  • Several live-webcams
  • Smoke detector
  • Water detector
  • Modular UPS
Environment:
  • Almost 400 power outlets mounted directly into the double floor
  • Every single power outlet electrically interlocked at 16 A
  • Cable bushings mounted into the double floor next to the power outlets
  • Completely locked double floor
  • AC ventilation grills, individually adjustable, mounted into the double floor
  • Cool water canalization only beneath the double floor
  • Two gullys for the case of a pipe leakage
  • 19''-Racks individually lockable
Service:
  • Personnel on site 365 days a year, also on holidays and weekends

Impressions:

Entrance to the datafloor Racks separately lockable
Tower servers and conditioning cabinet Tower servers and 19''-racks
Racks & unlocked core rack 1 Cooling via double floor and via ceiling absorption done by six ventilators

Core-equipment (routing and switching via Cisco Catalyst 6500; n x 10 Gbit/s)

GSM-antenna on the top of one rack - custom equipment is no problem; if your project has special requirements, just contact us!
Conditioning cabinet (expandable, redundant) Conditioning cabinet
Conditioning cabinet (expandable, redundant) Datafloor: ventilation grills, individually adjustable and power outlets (each one at 16A) mounted into the double floor
Anteroom to the datafloor: electricity -cool water canalization Electricity distribution cabinets
Cold water aggregate Skyline Munich in the background (O2-Tower - Frauenkirche - Olympiaturm)

Details regarding the core of our business - the servers - can be found here.